Most people who ask how to get a gold licence in Tanzania are asking the wrong question, because there is no single gold licence. Mining gold, buying gold, refining gold and exporting gold are four different activities, and each one sits under its own licence, its own eligibility rules and its own tax profile. A foreign investor who picks the wrong licence, or who buys a holding that cannot lawfully be sold to a foreigner, loses money before the first ounce is produced. This article sets out each licence, who may hold it, what the Government charges and where the traps are. It draws on the Mining Act, Cap. 123, the Mining (Mineral Rights) Regulations, 2018 and the fee schedule in GN 47 of 2018 as amended by GN 741 of 2019 and GN 419 of 2022.

The short answer is this. Exploration needs a prospecting licence. Small scale mining is reserved for Tanzanians under a primary mining licence. Medium and large operations need a mining licence or a special mining licence and must give the Government a free carried interest of at least 16 percent. Anyone who buys or sells gold needs a broker or dealer licence, and exporters must satisfy the 20 percent domestic set aside before the Mining Commission issues an export permit.

1.           Two regimes, not one

The Mining Commission grants mineral rights, which are the rights to explore for and mine gold. These are the prospecting licence, the primary mining licence, the mining licence and the special mining licence. The Commission separately grants trading and processing licences, which cover buying, selling, smelting, refining and exporting. A mining company that wants to sell its own gold abroad needs both sets of authority, or a contract with a licensed dealer or refinery that holds the second set.

All applications start on the online mining cadastre, where the applicant checks that the ground is free. Each applicant is capped at 20 prospecting licences or 2,000 square kilometres in total, so an investor assembling a large package should check how much room is left.

2.          The prospecting licence

A prospecting licence gives the exclusive right to explore. It is issued for up to four years, with renewals of three years and two years and one further year available to complete a feasibility study. The area is capped at 300 square kilometres for metallic minerals, which include gold, and the holder must give up part of the ground on renewal. Operations must start within three months of issue.

The gazetted fees for a gold prospecting licence are set in US dollars with a shilling equivalent, and may be paid in shillings at the Bank of Tanzania rate on the day of payment.

  • Application fee: USD 300 (TZS 700,000).
    • Preparation fee: USD 300 (TZS 700,000).
    • Renewal fee: USD 300 (TZS 700,000).
    • Annual rent per square kilometre: USD 100 (TZS 230,000) in the initial period, USD 150 (TZS 340,000) after the first renewal and USD 200 (TZS 500,000) after the second renewal.
    • Minimum prospecting spend per square kilometre: USD 500 in the initial period, USD 2,000 after the first renewal and USD 6,000 where further prospecting is allowed.

A renewal application must be filed at least six months before expiry with a tax clearance certificate. A licence that is close to expiry with an unmet spending obligation is a weak asset, and a buyer takes on that problem together with the licence. Ask for the work programme, the expenditure reports and the landholder compensation records before agreeing a price.

3.          The primary mining licence

3.1            Who may hold it and what it covers

The primary mining licence is the small scale licence and the one most associated with gold. Section 8(2) of the Mining Act allows it to be granted only to Tanzanian citizens and to companies whose members, directors and control are exclusively Tanzanian. The maximum area is 10 hectares and the term is seven years, renewable. A foreign company cannot hold one. Section 8(3) lets the Commission permit a foreign technical adviser where the skill is not available in Tanzania, and that is the limit of foreign involvement at licence level.

3.2           Government fees for a gold primary mining licence

The fees below are set in Tanzanian shillings by GN 741 of 2019, with the minimum rents raised by GN 419 of 2022.

  • Application fee: TZS 50,000.
    • Preparation fee: TZS 50,000.
    • Renewal fee: TZS 100,000.
    • Annual rent for gold: TZS 90,000 per hectare, with a minimum of TZS 180,000 for an area under 2 hectares. A full 10 hectare gold licence therefore pays TZS 900,000 a year in rent.
    • Transfer of the licence: TZS 500,000. Transfer of shares in a primary mining licence: TZS 1,130,000.
    • Amalgamation of primary mining licences: TZS 200,000. Certificate of suspension of work: TZS 50,000. Certificate of surrender of part or all of the area: TZS 50,000.

3.3           What a primary mining licence holder may sell

A holder may sell its own gold to licensed dealers or brokers, or at a Mineral Market. It has no general right to deal in gold bought from others. Many disputes involve a holder who has agreed to sell to a foreign buyer outside these channels, which exposes both sides to prosecution under section 18 of the Act.

3.4           Options for a foreign investor

A foreign investor can work with a primary mining licence area only through an arrangement that leaves the Tanzanian holder in control of the licence and the legal right to sell. Equity, board seats or a side letter that give a foreigner control put the licence at risk, because section 8(2) looks at membership, directors and control. The alternative is to wait until the holder converts the ground to a mining licence and then acquire an interest with the written consent of the Commission.

4.          The mining licence

A mining licence covers medium scale operations with capital investment between USD 100,000 and USD 100 million. The area is capped at 10 square kilometres. The term is up to 10 years, renewable for a further 10. The gazetted fees are an application fee of USD 2,000 (TZS 4,500,000), a preparation fee of USD 1,000 (TZS 2,300,000), a renewal fee of USD 2,000 and annual rent of USD 3,000 (TZS 6,800,000) per square kilometre for gold and other metallic minerals.

The applicant needs a feasibility study, an environmental certificate, a local content plan and a community plan, and applies over ground covered by its prospecting licence. Once the licence is granted, the state participation rules apply.

5.          The special mining licence

A special mining licence applies to operations of USD 100 million or more and runs for the life of the ore body or the period requested, whichever is shorter. The area is capped at 35 square kilometres, or 70 square kilometres for superficial deposits. The gazetted fees are an application fee of USD 5,000 (TZS 11,300,000), a preparation fee of USD 2,000 (TZS 4,500,000), a renewal fee of USD 5,000 and annual rent of USD 5,000 (TZS 11,300,000) per square kilometre.

Under the Mining (Minimum Shareholding and Public Offering) Regulations, 2016 (GN 286 of 2016), the holder must have at least 30 percent local shareholding, achieved through a public offer and listing on a stock exchange in Tanzania within one year of grant. The Minister may waive the shareholding where the offer fails and the Capital Markets and Securities Authority recommends it. Since GN 181 of 2020, the requirement does not apply where the holder has signed an agreement with the Government providing for free carried interest shares and an economic benefits sharing arrangement.

6.          State participation and local content

Section 10 of the Mining Act gives the Government not less than 16 percent non dilutable free carried interest in the holder of a mining licence or a special mining licence, and allows the Government’s total shareholding to reach 50 percent where it is tied to tax expenditure. The Mining (State Participation) Regulations, 2022 (GN 574 of 2022) require a framework agreement in the form set out in the First Schedule, together with a shareholders agreement and prescribed articles. The Regulations extend to beneficiation, so a processing arm of the project can fall within the same arrangement.

The Mining (Local Content) Regulations, 2018 (GN 3 of 2018) sit alongside this. An Indigenous Tanzanian Company is one with at least 51 percent of its equity owned by Tanzanian citizens and with citizens in at least 80 percent of executive and senior management positions. Regulation 8 gives such a company first preference in the grant of a mining licence and requires it to hold at least 5 percent equity for a mining licence to be granted, although the Minister may vary that figure. Fronting carries fines of TZS 100 million to TZS 250 million for the citizen involved, and far heavier penalties for a foreign party that colludes.

7.          Processing, smelting and refining licences

The Commission issues a processing licence for crushing, washing, gravity separation, flotation and chemical processing, a smelting licence for converting concentrate or doré into metal, and a refinery licence for producing investment grade gold. A person who does not hold a mineral right and wants to process tailings must sign an agreement with the mineral right holder and register it with the Commission, and tailings or loaded carbon cannot be moved without a Commission permit. Moving loaded carbon without a permit carries a fine of TZS 5 million to TZS 10 million, imprisonment of up to 12 months, or both.

These licences have become commercially important. Section 59 of the Mining Act requires a mineral right holder to set aside a percentage of its minerals, fixed by the Minister, for processing, smelting or refining in Tanzania. Refiners are the buyers for the gold that the set aside keeps in the country. An investor who is comfortable with a refining project has a route into the gold sector that avoids the primary mining licence restriction.

8.          Dealer and broker licences

A broker licence lets the holder buy gold from authorised miners and licensed dealers within the area of the resident mines office named in the licence, and sell it inside Tanzania. A broker cannot export. Brokers must record every transaction through the Commission’s point of sale system and file quarterly returns, and more than three breaches of the point of sale rules put the broker in default under the Act. The licence is issued for a year running from 1 July to 30 June.

A dealer licence lets the holder buy gold from miners and brokers, sell it in Tanzania or abroad and apply for export permits. Dealers renew annually and must keep full purchase and sales records showing where each consignment came from. Fees for both licences are set in the First Schedule to the Mining (Minerals and Mineral Concentrates Trading) Regulations, 2018. Dealer licence fees are scaled by mineral group, with diamonds in the highest band and gold grouped with metallic minerals and coloured gemstones.

9.          The 20 percent set aside and the Bank of Tanzania

The Mining (Minerals and Mineral Concentrates Trading) (Amendment) Regulations, 2024 (GN 539C of 2024), in force from 1 July 2024, require authorised miners and licensed dealers to set aside at least 20 percent of the gold they win or obtain. The set aside gold must be sold in Tanzania to licensed refineries, smelters or jewellers, or to the Government through the Bank of Tanzania. The Bank holds a right of pre emption. If it does not take the gold, it notifies the Commission in writing and the Commission authorises sale to refineries, smelters and jewellers. A miner or dealer that has not met the set aside is not issued a gold export permit.

The Bank of Tanzania Gold Purchase Programme notice of 1 October 2024 sets the commercial terms for sales to the Bank. Any quantity may be sold. The price follows the daily international benchmark published by the Mining Commission, payment follows within 24 hours of the refining report, and the Bank pays the refining cost. Sales under the programme pay royalty at 4 percent instead of 6 percent, no inspection fee, and VAT at zero.

10.       Royalty, levies and taxes

  • Royalty: 6 percent of gross value under section 87(1)(c) of the Mining Act, or 4 percent on sales to the Bank of Tanzania.
    • Inspection fee: 1 percent of gross value, or nil on sales to the Bank of Tanzania.
    • Mining levy: 0.1 percent of gross value, introduced by the Finance Act, 2025 to fund the HIV response.
    • Local government service levy: 0.3 percent of turnover, paid to the district council.
    • Corporate income tax: 30 percent. Withholding tax on dividends to a non resident: 10 percent, or 5 percent for a company listed on the Dar es Salaam Stock Exchange. Withholding tax on interest: 10 percent.

On a standard export, royalty, inspection fee and mining levy together take 7.1 percent of gross value before income tax. A seller routing gold through the Bank of Tanzania programme pays 4.1 percent, which is why many producers now structure their sales around the programme.

11.       Export permits and penalties

Gold cannot leave Tanzania without an export permit from the Mining Commission. A typical file includes the dealer licence, an assay report from the Tanzania Minerals Audit Agency, a certificate of origin, proof that royalty and the inspection fee were paid, a signed sale agreement and evidence of the 20 percent set aside. The minerals are examined, weighed and sealed by an authorised officer before the permit issues, and the permit lapses if the seals are broken before export. Customs clearance follows, using licensed security carriers. Allow two to four weeks from start to finish.

Possessing or dealing in minerals without the right licence or permit is an offence under section 18 of the Mining Act. An individual faces a fine of TZS 5 million to TZS 10 million, imprisonment of one to three years, or both. A company faces a fine of TZS 20 million to TZS 50 million. The minerals can be forfeited, and licences the offender already holds are exposed to cancellation.

12.       Choosing the right licence

  • Exploring new ground: a prospecting licence, open to foreign owned companies, at USD 600 in application and preparation fees plus USD 100 per square kilometre in first period rent.
    • Small scale mining on up to 10 hectares: a primary mining licence, reserved for Tanzanian citizens and wholly Tanzanian companies, at TZS 100,000 to apply and prepare plus TZS 90,000 per hectare a year.
    • A medium scale mine between USD 100,000 and USD 100 million of capital: a mining licence at USD 3,000 to apply and prepare plus USD 3,000 per square kilometre a year, with the 16 percent free carried interest.
    • A mine of USD 100 million or more: a special mining licence at USD 7,000 to apply and prepare plus USD 5,000 per square kilometre a year, with the free carried interest and the local shareholding rule.
    • Buying and selling gold: a broker licence for domestic purchases and a dealer licence for wider trading and export.
    • Processing, smelting or refining: the matching licence from the Commission, which also opens the domestic set aside market.

13.       Checklist before you buy or invest

  • Search the Commission register to confirm the licence is valid, who holds it and whether the ground carries any other application. A search costs USD 50 per hour.
    • Check the holder’s eligibility. A primary mining licence in a foreign controlled company is a defect that a side letter cannot repair.
    • Review the expiry date, the renewal window and the spending record.
    • Model the free carried interest, the Indigenous Tanzanian Company participation, royalty, inspection fee, levies and the 20 percent set aside.
    • Make the Commission’s written consent to any transfer or change of control a condition precedent. The transfer fee is USD 3,000 for mineral rights other than a primary mining licence.
    • Confirm the counterparty’s dealer licence and export history before signing a supply contract, and run anti money laundering checks on every counterparty.

14.       Frequently asked questions

Can a foreign company hold a gold mining licence in Tanzania?

Yes for prospecting licences, mining licences and special mining licences, subject to local content rules and state participation. No for primary mining licences, which section 8(2) of the Mining Act reserves for Tanzanian citizens and wholly Tanzanian companies.

How much does a gold primary mining licence cost?

The application fee is TZS 50,000, the preparation fee TZS 50,000 and annual rent TZS 90,000 per hectare, with a minimum of TZS 180,000 for an area under 2 hectares. Renewal costs TZS 100,000.

How much of a gold mine does the Government take?

At least 16 percent as a non dilutable free carried interest, and up to 50 percent in total where tied to tax expenditure.

What is the royalty on gold?

Six percent of gross value under section 87 of the Mining Act, plus a 1 percent inspection fee and the 0.1 percent mining levy. Sales to the Bank of Tanzania pay 4 percent royalty and no inspection fee.

Can I export gold without being a dealer?

Authorised miners and licensed dealers may apply for an export permit. A primary mining licence holder sells to licensed dealers or brokers or at a Mineral Market, and a broker cannot export.

What is the 20 percent set aside?

Under GN 539C of 2024, authorised miners and licensed dealers must sell at least 20 percent of their gold inside Tanzania to refineries, smelters, jewellers or the Bank of Tanzania. Without it, no gold export permit is issued.

What happens if I trade gold without a licence?

Section 18 of the Mining Act provides fines of TZS 5 million to TZS 10 million or imprisonment of one to three years for individuals, and fines of TZS 20 million to TZS 50 million for companies, with forfeiture of the minerals.

Disclaimer

This article is general information and not legal advice. It reflects the law as at 21 October 2026. Mining and gold trading rules in Tanzania change through regulations, government notices, Commission directives and annual Finance Acts. For advice on a specific licence or transaction, contact Sunday Ndamugoba at sunday@rive.co.tz or the firm at ask@rive.co.tz.

Leave a Reply

Your email address will not be published. Required fields are marked *