
Something significant is happening beneath the soils of North and South Unguja, and it has the potential to reshape Zanzibar’s economic trajectory for generations. In January 2026, the Zanzibar Petroleum Development Corporation (ZPDC) signed a one-year contract with Africa Geophysical Services (AGS) of Oman to conduct a 3D seismic data acquisition survey across onshore areas of Unguja Island. As a lawyer practising in both Tanzania and Zanzibar, it is worth stepping back from the headlines and examining what this development means legally, commercially, and practically.
1. From 2D to 3D: Why This Upgrade Matters
Zanzibar’s oil and gas exploration journey did not begin in 2026. In 2018, the Revolutionary Government of Zanzibar signed a Production Sharing Agreement (PSA) with UAE-based RAK Gas, which subsequently conducted 2D seismic surveys across Unguja and Pemba Islands. Those surveys produced encouraging preliminary results, including indications of approximately 3.8 trillion cubic feet of offshore gas potential, but they were inherently limited.
The fundamental difference between 2D and 3D seismic technology is not merely technical; it is decisional. A 2D seismic survey images the subsurface in vertical cross-sections. A 3D seismic survey images an entire volume of the earth’s subsurface, giving geologists a continuous three-dimensional picture of rock formations, potential reservoirs, and structural traps. It is the difference between a sketch and a full architectural blueprint.
“Our goal is clear: if hydrocarbons exist, we proceed; if not, we close the chapter based on scientific evidence.”
Mikidadi Ali Rashid, Managing Director, ZPDC
This transparency from ZPDC’s leadership is legally significant. It signals that Zanzibar’s approach to this phase of exploration is evidence-based and bounded, not speculative or open-ended. For investors and legal advisers, that posture matters when structuring future agreements.
2. The Legal Framework Governing the Survey
The 2016 Zanzibar Oil and Gas (Upstream) Act No. 6 of 2016 (the Act) remains the cornerstone of the legal framework under which all petroleum activities in Zanzibar, including this 3D seismic data acquisition, are conducted. The Act established ZPDC as Zanzibar’s National Oil Company and created the Zanzibar Petroleum Regulatory Authority (ZPRA) as the sector regulator.
Under the Act, ZPDC is mandated to oversee international oil and gas company operations, manage petroleum data, and participate in upstream activities with up to a 25% participating interest during the development phase on behalf of the Government. This is the statutory backdrop against which the ZPDC-AGS contract must be read.
2.1 Data Ownership and Confidentiality
One of the most commercially sensitive areas in any seismic acquisition contract is the question of who owns the data generated. Under petroleum laws across East Africa and consistent with the Zanzibar framework, seismic data acquired pursuant to a government-mandated exploration programme typically vests in the state or the national oil company. This means that the 3D seismic data gathered by AGS will, in all likelihood, belong to ZPDC and by extension the Revolutionary Government of Zanzibar. This has direct implications for any future licensing rounds: the government will hold proprietary data that it can use to attract and evaluate bids from international oil companies.
2.2 Community Rights and Land Access
Minister Masoud Ali Mohammed specifically called on residents of North and South Unguja to cooperate with the survey teams. This is not merely a courtesy request; it has legal dimensions. Onshore seismic surveys involve ground crews accessing private and communal land to lay receiver cables and, in some methodologies, create controlled vibrations. Under Zanzibar land law, this may engage rights of access, compensation for temporary occupation, and notification obligations. Landowners and community representatives in the affected areas should be aware of their legal entitlements and, where necessary, seek independent legal advice before granting access.
3. What This Means for Investors: Five Legal Insights
1. A Licensing Round is Likely. Prepare Now.
The completion of 3D seismic data processing by early 2027 will give ZPDC the subsurface information it needs to define drillable prospects and delineate exploration blocks for future licensing. Companies interested in participating in Zanzibar’s oil and gas sector should begin engagement and due diligence now, not after the round is announced. Zanzibar has already launched an offshore licensing round (March 2024), and onshore blocks are expected to follow the seismic results.
2. PSA Terms Will Be the Central Negotiation.
Any future exploration phase will be governed by a Production Sharing Agreement negotiated between the investor and ZPDC. The fiscal terms, including cost recovery ceilings, profit oil splits, royalties, and local content obligations, will determine the commercial viability of any discovery. Zanzibar has indicated a desire to offer renewed fiscal terms to enhance investor appeal. Legal advisers should be engaged early in PSA structuring.
3. Environmental and Social Governance (ESG) Compliance.
Any future development phase in Zanzibar will require Environmental Impact Assessments under both Zanzibar and Tanzania Mainland frameworks, community benefit agreements, and careful management of reputational risks associated with petroleum activities near coral reefs and marine ecosystems.
4. Constitutional Protections for Investment Are in Place.
Zanzibar has enacted constitutional protections for private investment in the sector. This is a meaningful signal for risk-averse investors. However, constitutional protection must be understood alongside the practical realities of enforcement, dispute resolution mechanisms, and the distinction between Zanzibar’s semi-autonomous jurisdiction and Tanzania Mainland’s legal system, a distinction that requires specialist legal advice.
5. Local Content: An Opportunity for Zanzibari Businesses.
The Act and Zanzibar’s broader policy framework contemplate local content requirements in petroleum operations. For Zanzibari companies across logistics, catering, equipment supply, legal and professional services, the oil and gas sector presents a real commercial opportunity. Positioning for that opportunity requires understanding the regulatory environment now, before the sector expands.
4. The Blue Economy Connection
It would be a mistake to view this 3D seismic survey in isolation from Zanzibar’s broader Blue Economy Policy, the overarching framework championed by President Dr Hussein Mwinyi’s administration. The Blue Economy Policy treats marine and land-based natural resources as integrated assets to be developed sustainably for socioeconomic growth. The Minister for Blue Economy and Fisheries has made clear that the seismic survey is a deliberate step under this policy, not a standalone venture.
This integration matters legally because it means that any oil and gas development in Zanzibar will be governed not only by the Oil and Gas Act but also by the broader suite of environmental, maritime, and economic regulation that sits under the Blue Economy framework. Legal practitioners and investors alike need to navigate that multi-layered landscape.
5. A Pivotal Moment, With Legal Work to Do
Zanzibar’s 3D seismic survey is not just a geological exercise. It is the precursor to potentially the most significant economic decision the island will face in a generation: whether to proceed to commercial oil and gas development, and on what terms. The results, expected by early 2027, will determine whether Zanzibar sits on commercially viable hydrocarbon reserves that can fund infrastructure, education, and social services, or whether it reorients investment into other blue economy sectors.
Either outcome has legal consequences. If hydrocarbons are confirmed, Zanzibar will need a sophisticated, investor-ready legal and regulatory environment, including updated model PSA terms, environmental regulations, local content frameworks, and dispute resolution infrastructure. If the survey returns negative results, the government will need to manage the transition of existing regulatory frameworks and investor expectations.
At RIVE&Co, we are closely monitoring developments in Zanzibar’s petroleum sector and are available to advise clients, whether investors, landowners, local businesses, or government stakeholders, on all aspects of the legal landscape as it evolves.
About the Author
Sunday Ndamugoba is a Partner at RIVE&Co, a corporate and commercial law firm qualified to practise in Tanzania and Zanzibar. The firm advises on energy and natural resources, investment structuring, commercial transactions, and regulatory compliance across both jurisdictions.
Contact: sunday@rive.co.tz
DISCLAIMER
This article is intended for general informational and educational purposes only. It does not constitute legal advice and should not be relied upon as such. The information provided reflects the author’s personal analysis as at the date of publication and may not reflect subsequent legal or regulatory developments. Readers should seek independent legal advice tailored to their specific circumstances before taking any action in reliance on this article. RIVE&Co accepts no liability for any loss or damage arising from reliance on the content of this publication.
